Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. {{:bmc:remedy:remedy-logo.png?nolink&16 |}} ** BMC Remedy ** ====== ITSM 8.1 Messages #43332 ====== ** {{:bmc:remedy:filter.gif?nolink |}} Filter ** === FIN:FCP:Target_MessageForNoTargetCostCenter`! === {{bmc:remedy:exclamation.gif?16&nolink |}} At least one target cost center is required if the source cost center allocation method is Equal Distribution or User-Defined Percentage. The target cost center will be unrelated and the allocation method for the source cost center will be set to None. ---- [[:bmc:remedy:message:itsm:8.1:start|Go back]] bmc/remedy/message/itsm/8.1/43332.txt Last modified: 9 years agoby 127.0.0.1 Log In